Skip to main content

Mid 19th century culvert on the Witham to Maldon dismantled railway line, Wickham Bishops (EHER 18518)

Please read our .

Summary

This is a 450mm diameter circular concrete culvert with concrete headwalls.

Map

Location

Grid reference Centred TL 8239 1187 (31m by 33m) (2 map features)
Civil Parish WICKHAM BISHOPS, MALDON, ESSEX

Type and Period

Description

1993. Field survey. The Witham to Maldon railway line was part of a longer route that joined Wickford with Bishops Stortford via Woodham Ferrers, Maldon, Witham and Braintree. The Maldon, Witham and Braintree Railway was opened in 1848 and following substantial losses over several years, the line was closed in April 1966 as part of the Beeching cuts. Track and ballast have generally been removed and sections sold to several owners, although the County Council is the majority owner. This is a 450mm diameter circular concrete culvert with concrete headwalls. For other bridges and culverts see: EHER 8457, EHER 18507-18517, EHER 18519-18533. Grade *. <1>

Sources

  • <1> Report: ECC. 1993. Witham to Maldon Railway (dismantled) Survey of bridges and culverts.

Related Monuments/Buildings (2)

Comments

Do you have any questions or more information about this record? Please feel free to comment below with your name and email address. All comments are submitted to the website maintainers for moderation, and we aim to respond as soon as possible. Comments, questions and answers that may be helpful to other users will be retained and displayed along with the name you supply. The email address you supply will never be displayed or shared.

Comments